Scheduling Trees onto Hypercubes and Grids(Special Section on Discrete Mathematics and Its Applications)
スポンサーリンク
概要
- 論文の詳細を見る
In the last three decades, task scheduling problems onto parallel processing systems have been extensively studied. Some of those problems take communication delays into account. In most of previous works, the structure of the parallel processing systems of the scheduling problem is restricted to be fully connected. However, the realistic models of parallel processing systems, such as hypercubes, grids, tori, and so forth, are not fully connected and the communication delay has a great effect on the completion time of tasks. In this paper, we show that the problem of scheduling tasks onto a hypercube/grid is NP-complete even if the task set forms an out- or in-tree and the execution time of each task and each communication take one unit time. Moreover, we construct linear time algorithms for computing an optimal schedule of some classes of binary and ternary trees onto a hypercube if each communication has one unit time.
- 社団法人電子情報通信学会の論文
- 2002-05-01
著者
-
Tayu S
Japan Advanced Information Sci. And Technol. Ishikawa Jpn
-
Tayu Satoshi
The Author Is With The School Of Information Science Japan Advanced Institute Of Science And Technol