3-B-4 A SCHEDULING METHOD FOR PAINTING LINE UNDER PULL PRODUCTION
スポンサーリンク
概要
- 論文の詳細を見る
This paper concerns with a scheduling method for painting (preceding) line with much longer production lead-time than assembly (subsequent) line. In general, production schedule of the painting line is made independently based on the forecasted job requirement at the assembly line. When the job requirement changes at the assembly line, therefore, production balance is destroyed between the both lines. To avoid the tardiness caused by such unbalance, we need to have many inventories for the painting line. Such countermeasure is taken place in many companies actually. Thus, to avoid the tardiness while keeping small inventory, we propose a scheduling method that makes a Pseudo-Pull production possible for the painting line. We have evaluated the proposed method by computer simulations.
- 一般社団法人日本機械学会の論文
著者
-
Shinbo K.
Production Systems Engineering Toyohashi University Of Technology
-
Yoo J.
Production Systems Engineering Toyohashi University of Technology
-
Shimizu Y.
Production Systems Engineering Toyohashi University of Technology