C109 FBR サイクルに関する実用化戦略調査研究(フェーズ 1)について
スポンサーリンク
概要
- 論文の詳細を見る
Japan Nuclear Cycle Development Institute (JNC) have started the following feasibility studies (F/S) in order to develop a commercialized fast breeder reactor (FBR) cycle system satisfying the needs of the future society since JFY1999 with the electric companies. In the F/S, a number of candidate concepts will be selected from various options about the FBR system and the related fuel cycle system (reprocessing and fuel fabriction), featuring innovative technologies. The options are examined considering the attainable perspective for the followings : 1) safety, 2) economic competitiveness to future LWRs, 3) efficient utilization of uranium resources, 4) reduction of environmental burden and 5) enhancement of nuclear non-proliferation in order to determine the promising concepts making the most of the merits of the FBR cycle system and to define the necessary R&D tasks. In the end of JFY2000,we will determine the promising concepts from various options and summarize the results of the F/S (Phase I). Current status of these F/S activities was described in this paper.
- 一般社団法人日本機械学会の論文
- 2000-10-30
著者
関連論文
- 高速増殖炉
- 高速増殖炉サイクルの実用化戦略調査研究 - フェーズI成果の概要 -
- 最近の高速(増殖)炉の開発動向 (特集 次世代型原子炉の開発戦略を探る)
- 第4世代原子力システム技術開発
- C109 FBR サイクルに関する実用化戦略調査研究(フェーズ 1)について
- 技術報告 高速増殖炉サイクルの実用化戦略調査研究 フェーズ2の2001年度成果
- 高速増殖炉サイクルの実用化に向けた調査研究--実用化戦略調査研究
- 高速増殖炉サイクルの実用化戦略調査研究--フェーズ1の成果
- 高速増殖炉サイクルの実用化戦略調査研究 フェーズ1成果の概要 (特集 核燃料サイクルに挑む)
- 高速増殖炉サイクルの実用化戦略調査研究の取組み状況