製銑用新型電氣高爐の設計及び操業に就て
スポンサーリンク
概要
- 論文の詳細を見る
In Japan where the caking coal is lacking, the method of electric iron manufacture consuming cokes less than 400 kg per ton pig plays an important role in enhancing the production of iron. However, the construction and operation of electric high furnace (Elektrohochofen) for iron manufacture has all turned out in failure in the past years here. The cause of the failure seems to be the fact that the design of the furnace has depended on the foreign invention. In answer to such state of matters, the author designed and constructed an electric furnace the most suitable for the present Japan. The present paper dealt with the process of its development. Several points of imporvement in the electrical, metallurgical and mechanical designs were described, the actual result of its operation demonstrated, and an optimum method suggested to attain to the maximum pig production with an electric high furnace.
- 社団法人日本鉄鋼協会の論文
- 1943-07-25
著者
関連論文
- 電気製鋼の現状と将来
- 一般情勢について(訪ソ特殊鋼視察団報告講演)
- 最近に於ける製鋼用電気弧光炉の進歩
- 製鋼用弧光爐の電氣的特性に就て
- 製鋼用弧光爐の設計に就て
- 電氣銑を原料とする電氣製鋼試験に就て
- 製銑用新型電氣高爐の設計及び操業に就て
- 弧光爐用電極に就て
- 電氣弧光爐の電氣的特性に就て