An antenna of phased array radar (PAR) consists of a large number of individual radiating elements and steers its electromagnetic wave direction by shifting wave phases of these elements. Failed elements have to be detected, diagnosed, localized and replaced at scheduled times to hold a required performance of a radar system. However, the maintenance of an antenna should not be made so frequently, because it interrupts the radar operation and degrades the radar availability. This paper considers two typical policies of cyclic and delayed maintenances for a PAR where a certain number of survival elements is needed to hold a required performance : Failed elements in cyclic maintenance are replaced at periodic times, and they in delayed maintenance are done when their number has exceeded a predesignated one. When failures of a PAR antenna elements occur at a Poisson process, the expected costs are obtained and optimal policies for two maintenances which minimize them are analytically discussed.
- 社団法人日本オペレーションズ・リサーチ学会の論文
著者
-
Nakagawa Toshio
Aichi Institute of Technology
-
Nakagawa T
Aichi Institute Of Technology
-
Nakagawa Toshio
Aichi Inst. Of Technol. Toyota‐shi Jpn
-
Ito Kodo
Mitsubishi Heavy Industries, LTD.
-
Ito Kodo
Mitsubishi Heavy Industries Ltd.
-
Nakagawa Toshio
Aichi Inst. Of Technol.
関連論文
- OPTIMAL BACKWARD AND BACKUP POLICIES IN RELIABILITY THEORY
- COMPARISON OF CYCLIC AND DELAYED MAINTENANCES FOR A PHASED ARRAY RADAR
- 2-E-10 Partition Number and Redundant Number in Reliability
- 1-D-6 Optimal Replacement Policies for Damage Models with the Limit Number of Shocks
- CUMULATIVE DAMAGE MODEL WITH TWO KINDS OF SHOCKS AND ITS APPLICATION TO THE BACKUP POLICY
- AN OPTIMAL INSPECTION POLICY FOR A STORAGE SYSTEM WITH THREE TYPES OF HAZARD RATE FUNCTIONS
- Random Checkpoint Models with N Tandem Tasks
- Two Generational Garbage Collection Models with Major Collection Time
- COMPARISONS OF REPLACEMENT POLICIES WITH CONSTANT AND RANDOM TIMES
- 2-A-11 A Note on Inspection Overtime Policy
- 2-A-10 Age Replacement with Threshold Number of Faults
- 2-B-4 Damage Model with Threshold Number of Shocks
- 1-C-6 A Survey of "whichever occurs first" in Bivariate and Trivriate Replacement Modelings