系統への影響を考慮した大規模太陽光発電システムの出力制御技術 : 稚内メガソーラープロジェクトでの研究成果
スポンサーリンク
概要
- 論文の詳細を見る
The mega-solar demonstration project named “Verification of Grid Stabilization with Large-scale PV Power Generation systems” had been completed in March 2011 at Wakkanai, the northernmost city of Japan. The major objectives of this project were to evaluate adverse impacts of large-scale PV power generation systems connected to the power grid and develop output control technologies with integrated battery storage system. This paper describes the outline and results of this project. These results show the effectiveness of battery storage system and also proposed output control methods for a large-scale PV system to ensure stable operation of power grids. NEDO, New Energy and Industrial Technology Development Organization of Japan conducted this project and HEPCO, Hokkaido Electric Power Co., Inc managed the overall project.
- 2011-10-01
著者
関連論文
- 大規模電力供給用太陽光発電系統安定化等実証研究--稚内サイトにおける研究概要と現在までの成果
- 周波数変動の抑制に向けた風力発電機の新しいピッチ制御系
- NEDOソーラープロジェクト稚内サイトにおける実証研究
- 系統への影響を考慮した大規模太陽光発電システムの出力制御技術 : 稚内メガソーラープロジェクトでの研究成果