A Case Study of Requirements Elicitation Process with Changes
スポンサーリンク
概要
- 論文の詳細を見る
Requirements changes sometimes cause a project to fail. A lot of projects now follow incremental development processes so that new requirements and requirements changes can be incorporated as soon as possible. These processes are called integrated requirements processes, which function to integrate requirements processes with other developmental processes. We have quantitatively and qualitatively investigated the requirements processes of a specific project from beginning to end. Our focus is to clarify the types of necessary requirements based on the components contained within a certain portion of the software architecture. Further, each type reveals its typical requirements processes through its own rationale. This case study is a system to manage the orders and services of a restaurant. In this paper, we introduce the case and categorize its requirements processes based on the components of the system and the qualitative characteristics of ISO-9126. We could identify seven categories of the typical requirements process to be managed and/or controlled. Each category reveals its typical requirements processes and their characteristics. The case study is our first step of practical integrated requirements engineering.
- 電子情報通信学会の論文
- 2010-08-01
著者
-
Hashimoto Masaaki
Kyushu Institute Of Technology
-
Nakatani Takako
University Of Tsukuba
-
NAKATANI Takako
Graduate School of Systems Management, the University of Tsukuba
-
HORI Shouzo
Quality Assurance Dept. Yaskawa Information Systems Corporation
-
UBAYASHI Naoyasu
Faculty of Information Science and Electrical Engineering, Kyushu University
-
KATAMINE Keiichi
Graduate School of Computer Science and Systems Engineering, the Kyushu Institute of Technology
-
HASHIMOTO Masaaki
Graduate School of Computer Science and Systems Engineering, the Kyushu Institute of Technology
-
HORI Shozo
Yaskawa Information Systems Corporation
関連論文
- A Case Study of Requirements Elicitation Process with Changes
- Project Management Patterns to Prevent Schedule Delay Caused by Requirement Elicitation
- Toward the Decision Tree for Inferring Requirements Maturation Types