系統計画のための(N-1)発電余力高速算出法の開発
スポンサーリンク
概要
- 論文の詳細を見る
As the power system deregulation advances, the competition among the power companies becomes heated, and they seek more efficient system planning using existing facilities. Therefore, an efficient system planning method has been expected. This paper proposes a quantitative evaluation method for the (N-1) generation margin considering the overload and the voltage stability restriction. Concerning the generation margin related with the overload, a fast solution method without the recalculation of the (N-1) Y-matrix is proposed. Referred to the voltage stability, this paper proposes an efficient method to search the stability limit. The IEEE30 model system which is composed of 6 generators and 14 load nodes is employed to validate the proposed method. According to the results, the proposed method can reduce the computational cost for the generation margin related with the overload under the (N-1) condition, and specify the value quantitatively.
- 社団法人 電気学会の論文
- 2009-04-01
著者
関連論文
- エネルギー関数法に基づく過渡安定度発電余力推定手法
- 短絡電流法電力系統縮約手法の精度向上
- 観測電圧に基づく瞬低時系統電圧分布推定手法の開発
- 電圧不安定を含む(N-1)電圧安定性高速ランキング手法
- 系統計画のための(N-1)発電余力高速算出法の開発
- 潮流感度に基づく(N-1)電圧安定性高速ランキング手法
- 系統計画のための(N-1)発電余力高速算出法の開発
- 配電系統潮流計算における低圧系統モデルの拡充