A STUDY ON DETERMING METHOD OF RAIN GAUGE INSTALLATION INTERVAL AND TRAIN OPERATION CONTROL CRITERIA FOR RAILROAD
スポンサーリンク
概要
- 論文の詳細を見る
Train operation is suspended to ensure safety when the precipitation observed by a rain gauge exceeds the train operation control criteria. This paper proposes a method to determine the rain gauge installation interval and the train operation control criteria suitable for hourly precipitation. Those are evaluated from the viewpoints of both safety and reliability of train operation, based on the spatial distribution of precipitation observed by rain gauges. This paper shows the combinations of the rain gauge installation interval and the train operation control criteria which can improve either safety or reliability when one is kept constant, or can improve both. For instance, in the case that the rain gauge installation interval is reduced from 10 km, which is the current standard interval adopted by many railway companies, to 5km, the train operation control criteria are raised by 17% and reliability can improve by 25% when safety is kept constant, and the train operation control criteria are raised by 8% and safety can improve by 19% when reliability is kept constant.
- Japan Society of Civil Engineersの論文
Japan Society of Civil Engineers | 論文
- Free in-plane vibration of nonuniform arches with various shapes of axis and initial loads.
- Geometrically nonlinear analysis of nonuniform arches of any shape.
- STUDY ON THE OPTIMUM SIZE OF RAILWAY SLEEPER FOR BALLASTED TRACK
- Geometrically and materially nonlinear analysis of nonprismatic arches of any shape.
- タイトル無し