STUDY ON DETERMINATION METHOD OF AMOUNT OF DAM DISCHARGE BASED ON THE RUNOFF CHARACTERISTICS
スポンサーリンク
概要
- 論文の詳細を見る
Flood control and water use regulation by dam operation play important roles in total management of a large-scale river basin. A new method of discharge control intended to increase the efficiency of flood control and water use is proposed in this paper. This method is based on the idea that there is no risk to reduce reservoir level if the amount of anticipatory release equal to the amount of inflow which flows into a dam certainly from the rainfall that has already fallen. With this method, it is possible to achieve higher storage level in reservoirs even during the flooding season, providing more opportunities for water use in addition to flood control. Furthermore, large amount of water is discharged from time to time as the anticipatory release which is useful to maintain river environment.
- 社団法人 土木学会の論文
社団法人 土木学会 | 論文
- 寒冷地気温変動下における高減衰ゴム支承材内部温度の応答確認実験及び数値解析
- 橋梁各部材の資産的評価と橋梁健全度指数の解析
- 連続トラス橋の桁端衝突応答解析と緩衝材の効果に関する検討
- 渋滞解消を考慮した渋滞区間判定モデルの構築とファジィ推論の適用
- 人間の知覚に基づく高速道路渋滞の情報提供とその評価に関する研究