CONNECTING FORCE BETWEEN CONCRETE SLAB AND STEEL GIRDER AT INTERMEDIATE CROSS BEAMS IN COMPOSITE TWO-I-GIRDER BRIDGES
スポンサーリンク
概要
- 論文の詳細を見る
In composite two-I-girder bridges, at the position which intermediate cross beams are installed, lalge stress transfer between concrete slab and steel girder is produced. Since the rotation of upper steel flange is restricted by vertical stiffeners, large stress transfer occurs. This paper describes on-site experimental results and based on them, the design method of studs is proposed. The experiment includes a long-term observation and vehicle loading. It is predicted, under the condition that the headed stud is not installed top of the vertical stiffeners, that no fatigue damage in studs and welding part between upper flange and vertical stiffener occurs within 100 years or so. Furthermore, the way of finite element modeling of the connecting part for estimating the stress level is also presented.
- 社団法人 土木学会の論文
社団法人 土木学会 | 論文
- 寒冷地気温変動下における高減衰ゴム支承材内部温度の応答確認実験及び数値解析
- 橋梁各部材の資産的評価と橋梁健全度指数の解析
- 連続トラス橋の桁端衝突応答解析と緩衝材の効果に関する検討
- 渋滞解消を考慮した渋滞区間判定モデルの構築とファジィ推論の適用
- 人間の知覚に基づく高速道路渋滞の情報提供とその評価に関する研究