Cost Allocation in Dam Removal Project
スポンサーリンク
概要
- 論文の詳細を見る
In dam removal project, dam manager may prefer to wait the others' removal and learn the impact of the environment by removal. If all managers in the basin have same preference, the dams cannot be removed efficiently. In this study, we model the dam removal project by use of game theory and dynamic programming. Then, we show that cost allocation method proposed in cooperative game theory can contribute to efficient dam removal. In addition, we propose the cost allocation scheme which enables the manager to apply theoretical result without complicated mathematical computation.
- 公益社団法人 土木学会の論文
公益社団法人 土木学会 | 論文
- Design and Construction Process of Hakusui Dam Considering from Group of Construction Photographs
- Organization-Focused Consideration of Bridge Diffusion Strategy of the Hennebique Company
- A Study on the Technical Transfer of the Hennebique Co. Analyzing the Design Process of the Risorgimento Bridge
- Characteristics of Mud Flow Caused by Water Flow and Its Hydraulic Modelling
- タイトル無し