CONSTRUCTION AND QUALITY CONTROL OF NON-JOINTED POROUS CONCRETE PAVEMENT
スポンサーリンク
概要
- 論文の詳細を見る
Total amount of constructin of non-jointed porous concrete pavement has reached to 5169 m2 including 20 construction sites until now. However, it has been realized that the reproduction of the quality of the materiailn fields equivalent to laboratory specimens was very difficult, because of the reason that the method of construction and quality control has not been examined thoroughly.<BR>In order to solve the problems, the laboratory tests and trail field construction were carried out. Based on the results of these investigations, the practical method of construction and quality control could have been established.
- 公益社団法人 土木学会の論文
公益社団法人 土木学会 | 論文
- Design and Construction Process of Hakusui Dam Considering from Group of Construction Photographs
- Organization-Focused Consideration of Bridge Diffusion Strategy of the Hennebique Company
- A Study on the Technical Transfer of the Hennebique Co. Analyzing the Design Process of the Risorgimento Bridge
- Characteristics of Mud Flow Caused by Water Flow and Its Hydraulic Modelling
- タイトル無し