The assignment/reassignment agreement for the offshore drilling rig acquisition: A case history in the Kingdom of Cambodia.:A case history in the Kingdom of Cambodia
スポンサーリンク
概要
- 論文の詳細を見る
Cambodia Petroleum Exploration Co., Ltd. (CAMPEX) drilled its third exploratory well named "Poulo Wai-1" in August 1996 in the Block III of Offshore Cambodia. In order to select a drilling rig, CAMPEX studied the two contract systems: an Assignment/Reassignment Agreement system ("Assignment") and a Tender system. It was concluded that "Assignment" was more cost effective than a Tender on this particular well after a series of negotiation with Enterprise Oil Exploration Ltd. (Enterprise). CAMPEX decided to adopt "Assignment" and acquired a drill ship. The main points of the agreement were that CAMPEX was assigned the right and the duty of one option well from the original agreement made by Enterprise and that CAMPEX shared a mobilisation and a demobilisation cost of the rig, a rig modification cost and a time-writing cost with Enterprise. For the sake of the adoption of "Assignment", CAMPEX saved the total well cost significantly.
- 石油技術協会の論文
石油技術協会 | 論文
- 地震波シミュレーションが地下構造探査に果たす役割
- インバージョンテクトニクス
- 最近の探鉱プレイへの構造形成モデルの貢献
- 堆積盆地の地史情報に基づく沈降モデルと構造形成--日本海東部と中国北部湾を例にして (第55回石油技術協会総会地質・探鉱部門シンポジウム--堆積盆地評価とその応用)
- 東北裏日本海域における石油の生成と移動の時期 (「石油の生成と移動の時期」シンポジウム特集号)