Simple Construction Technique of Orchard Path in Slope Land.
スポンサーリンク
概要
- 論文の詳細を見る
In order to make a mechanization possible in citrus orchard in slope land, the orchard path construction by a simple soil stabilization technique was developed.1) The minimum width of orchard path arranged with a space of 5 to 10 meters in contour was about 80 centimeters from both sides of the trafficability of the transport vehicles and a present state of sloped land. The density of orchard path was amounted to 100 to 200 meters per 10 ares.2) The surface stabilization technique holding together cement, special setting material (Soiler) with on-the-spot soil was considered to be enough for farm roads, which may be cheep and easy to construct. The optimum mixing rate was 13% of cement and 0.3% of setting material.3) This simple soil stabilization technique by farmers using such as machines like the small size buckhoe, the spreader and the rotary tiller was so simple and less expensive.
- 日本農作業学会の論文
日本農作業学会 | 論文
- 日本とオランダにおけるチューリップ球根生産者の生活時間構成の比較--大規模経営における農繁期の調査事例
- 不織布マルチングによる水稲直播・有機栽培--代かき時期と基肥施用時期の影響
- ガソリンエンジン排気ガス中のエチレンが施設内作物の落花・落蕾に及ぼす影響
- ハイパースペクトル画像解析によるカバークロップ圃場の構成草種および草量の空間分布推定
- 乗用型トラクタによるリバーシブルプラウ作業の習熟過程に関する人間工学的研究