The case of construction to increase a track between the section of high embankment and poor subsoil
スポンサーリンク
概要
- 論文の詳細を見る
We, TOBU RAIL WAY CO. LTD, have been working on the construction to lay double tracks in place of a present single line between IWATUKI and KASUKABE. (it's distance is around 7.4 kilometers) There are purpose for this construction; first, to increase the capacity of transportation, second, to relieve congestion and third, to cope with the demand of transportation whose scale may be bigger in the future in TOBU NODA LINE. There is high embankment between the section we are working on. Geological feature of there is poor subsoil which is made from organic silts, humus soil and tuffic clay. Moreover, along the side of a railroad, houses stand together. After our much consideration about aspects of difficulties of the construction, an environmental and economical matter, and periods we would need to spend, we concluded that widening embankment by an usual method which retains a wall might cause some problems.Then, this time, we have decided to adopt the different way which reinforces banks. Recently, this kind of method has been making actual results and is recognised to be an excellent way for aseismicity.In this paper, we are going to state about circumstances explaining about how and why we made a decision to try this way-by reinforcing banks-to widen embankment, and also about results from our examinations, plans, methods of construction on the place where there is high embankment placed on the poor subsoil.
- 国際ジオシンセティックス学会 日本支部の論文
国際ジオシンセティックス学会 日本支部 | 論文
- 二重壁構造を有する補強土壁の両面盛土への適用
- 二重壁構造をもつ垂直補強土擁壁の現場実験と数値解析
- 廃棄物処分場向け遮光性保護マットの屋外暴露挙動について
- 線状高分子混合処理土と遮水シートの境界面における遮水性の評価
- 補強土擁壁の地震時変位量計算手法の構築及び実被害事例への適用