Diamond Drilling in the Mamut Mine
スポンサーリンク
概要
- 論文の詳細を見る
Under the contract with Overseas Mineral Resources Development Company Limited, a prospecting project by diamond drillings in the Mamut mine, Sabah, Malaysia, was carried out as a joint venture of Sumiko Consultants Co., Ltd., and Nikko Exploration and Development Co., Ltd., during the period of fifteen months from June, 1968 to August, 1969.<BR>The project was divided into two stages, the first and the second. The outline of these stages is shown in the following table :<BR>1 st Stage<BR>2 nd Stage<BR>(from June to November, 1968)<BR>(from December, 1968 to August, 1969)<BR>No. of holes 21 55<BR>Total length 4, 297m 11, 424m<BR>Drilling length per one shift 7.03m 7.95m<BR>Core recovery 81.8% 83.0%<BR>In pursuing the works of these stages, the following considerations were made :<BR>Transportation : All of the drilling machines and tools were transported by the cableways because of rugged topography and thick vegetation.<BR>Drilling Machine : High speed-type machines which have good efficiency for hard rocks were used. Diamond bits were selected carefully in accordance with the hardness of rocks.<BR>Cutting Oil and Chemical Grout : Some amounts of cutting oil were added in circulating water in order to increase the cutting efficiency. The wall was protected from caving by chemical grout in many fractured zones.
- 資源地質学会の論文
資源地質学会 | 論文
- 資源情報 2008年度秋季講習会 西南北海道の中新世熱水活動と金属鉱化作用
- 飛騨帯の石灰岩類 -地質特性・構成鉱物・岩石組織とドロマイトの産状-
- 飛騨帯神岡鉱床周辺の変閃緑岩・変斑れい岩類
- 神岡鉱床周辺のいわゆる伊西ミグマタイトとスカルン鉱(杢地鉱)中の単斜輝石の組成変化
- 北部北上山地南東部, 大谷山鉱山北方地域に分布する層状マンガン鉱床の層位学的研究