The long-term generation scheduling in power utilities is aimed at maintaining power supply sufficiency and estimating fuel consumption. The multi-period constraints, such as allowable numbers of unit commitment on a thermal unit and fuel consumption under given total amount of fuel, need to be taken into appropriate consideration for practically economic scheduling in long-term scheduling horizon. Due to the large size and complexity of such scheduling problem, it is difficult to get the solution collectively in terms of stability and processing time in operational situations. We propose a new scheduling method which consists of “preparative processing” and “detailed optimization processing”. The former works to divide the long-term problem with the multi-period constraints in time unit of week according to quick and simplified scheduling result, and the latter to minimize total operation cost on the basis of those weekly partitioned problems. The processing starts with an optimal scheduling result excluding the two multi-period constraints aforementioned and proceeds to sequentially resolve the violation of the each constraint in quantitative consideration of interrelationship between them. This paper describes the validation and effectiveness of the proposed method through the real world example of Chubu Electric Power Company.
著者
-
橋本 博幸
三菱電機(株)先端技術総合研究所
-
広瀬 公一
三菱電機(株)系統変電システム製作所
-
橋本 博幸
三菱電機(株)先端技術総合研究所
-
平野 秀明
三菱電機(株)先端技術総合研究所
-
伊佐治 圭介
中部電力(株)
-
高橋 順一
中部電力(株)
関連論文
- 電力取引支援システム"BLEnDer"Trader (特集 新たな時代の電力ビジネスに対応したシステムソリューション)
- 有効制約の推定機構を持つ内点法に基づく二次計画アルゴリズムの開発
- 電力市場向けリスク管理・ポートフォリオ運用システム (特集 エネルギーソリューション)
- 動特性負荷モデルによる実故障データの特性分析を利用した負荷脱落量推定手法
- 動的負荷モデルによる負荷脱落量推定手法の検討
- 新しいSSC制御論理に関する基礎研究
- 高速・安定な二次計画法の開発と実用問題への適用
- エネルギー関数を用いた安定度指標によるFACTS機器の効果検証
- 起動停止回数と燃料消費量の制約を考慮した年間需給計画手法の開発
- Second-kick 改善法を適用したエネルギーベース指標によるSVCの安定度向上効果の検証
- 起動停止回数と燃料消費量に対する制約を考慮した年間需給計画手法の開発
- 起動停止回数と燃料消費量に対する制約を考慮した年間需給計画手法の開発