電力季時別科金制下のコジェネレーションシステムの最適設計・運用計画
スポンサーリンク
概要
- 論文の詳細を見る
For commercial customers with a cogeneration system (CGS), a mixed integer programming model is used to examine effects of time-of-use (TOU) rate structure on the optimal operation of the system as well as its optimal capacity. Three case studies are performed for a hotel, a hospital, and an office building (20, 000m2 in total floor space, respectively). The optimal capacity of the generator under the flat rate is 50 to 70% of peak power demand. Effects of on-peak/off-peak energy charge ratio are saturated at a ratio of 5. It is not until the energy charge ratio of between 2 and 5 that the purchase of off-peak power increases in summer when price reduction is applied to city gas. As the energy charge ratio is raised, cheaper off-peak power is substituted for city gas and the summation of electricity energy charge and gas energy charge decreases. The simulation results indicate that properly designed TOU rates may provide commercial customers an incentive to operate a cogeneration system with an appropriate mix of the self-generation and commercial power.
- 社団法人 電気学会の論文
著者
関連論文
- 飲食店舗における用途別エネルギー消費実態の調査とその変動要因分析
- 小規模業務用需要家の電力・ガス・給湯消費の実測調査とその変動要因分析--飲食店舗における調査事例
- 真の省エネ・省CO_2を目指したエネルギーチェーンの視点(IV) : 新技術普及によるマクロ影響評価-新技術の技術選択分析と普及分析-
- 6 MGT発電システムの経済性分析
- 電力季時別科金制下のコジェネレーションシステムの最適設計・運用計画
- 業務用需要家の季時別料金反応モデル : コージェネレーション設置需要家の事例(生産)