Addressing Production System Failures Using Multi-agent Control
スポンサーリンク
概要
- 論文の詳細を見る
Output in high-volume production facilities is limited by bottleneck machines. We propose a control mechanism by modeling workstations as agents that pull jobs from other agents based on their current WIP level and requirements. During failures, when flows of some jobs are disrupted, the agents pull alternative jobs to maintain utilization of their capacity at a high level. In this paper, we empirically demonstrate that the proposed mechanism can react to failures more appropriately than other control mechanisms using a benchmark problem of a semiconductor manufacturing process.
著者
-
Miyashita Kazuo
National Institute Of Advanced Industrial Science And Technology
-
Gautam Rajesh
University of Tsukuba
関連論文
- 1B3 ADVANCED WIP CONTROL METHOD FOR SEMICONDUCTOR MANUFACTURING(Technical session 1B : Meta Heuristics)
- 8A1 MULTIAGENT BASED PRODUCTION CONTROL TO PREVENT CAPACITY LOSS DURING FAILURES(Technical session 8A: Production control)
- Addressing Production System Failures Using Multi-agent Control