A 28 GHz 1 MW with TE8,3 cavity for GAMMA10 tandem mirror and a 77 GHz 1.5 MW gyrotron with TE18,6 for Large Helical Device (LHD) have been developed to upgrade their Electron Cyclotron Heating (ECH) systems. In the 28 GHz gyrotron, the maximum power of 1.05 MW was obtained, which is in agreement with its design target value. And the high efficiency of 40% without collector potential depression (CPD) was obtained with 0.8 MW. In the first and second 77 GHz gyrotrons, 0.8 MW 3.6 sec., 0.3 MW 60 sec operations have been achieved, but several issues due to the stray RF and velocity dispersion have been found, too. In consideration of these, the design improvement was performed to aim at 1.5 MW in the third tube. In the short pulse test, the maximum output power of 1.6 MW and the maximum total efficiency of 49.4% with CPD were obtained. In the long pulse test, the pulse length extended to 5 sec with 1 MW, 1800 sec with 0.1 MW, 1.6 sec with 1.5 MW. Total injection power of 3.1 MW to LHD plasma has been achieved. It is shown that the electron beam pitch factor α decreases with increasing of beam current, comparing with the experimental and calculation results.
論文 | ランダム
- TK-2-1 JABEE認定の2010年度改定内容とJABEEの最近の動き(TK-2.2010年度JABEE認定基準の改定に関する説明会,大会委員会企画)
- TK-2-1 JABEE認定の2010年度改定内容とJABEEの最近の動き(TK-2.2010年度JABEE認定基準の改定に関する説明会,大会委員会企画)
- TK-2-1 JABEE認定の2010年度改定内容とJABEEの最近の動き(TK-2.2010年度JABEE認定基準の改定に関する説明会,大会委員会企画)
- 刊行500号までの道のりと次の節目に向けて : 本論文誌刊行の経緯と現状(刊行500号を迎えて)
- TK-1-2 Rubricsの演習への展開 : 中央大学理工学部情報工学科の場合(TK-1.今話題のRubrics:必要な学習成果評価ツール,大会委員会企画)