A multi-objective lead time control problem in multistage assembly systems using genetic algorithms
スポンサーリンク
概要
- 論文の詳細を見る
In this paper, we develop a multi-objective model to optimally control the lead time of a multistage assembly system, using genetic algorithms. The multistage assembly system is modelled as an open queueing network. It is assumed that the product order arrives according to a Poisson process. In each service station, there is either one or infinite number of servers (machines) with exponentially distributed processing time, in which the service rate (capacity) is controllable. The optimal service control is decided at the beginning of the time horizon. The transport times between the service stations are independent random variables with generalized Erlang distributions. The problem is formulated as a multi-objective optimal control problem that involves four conflicting objective functions. The objective functions are the total operating costs of the system per period (to be minimized), the average lead time (min), the variance of the lead time (min) and the probability that the manufacturing lead time does not exceed a certain threshold (max). Finally, we apply a genetic algorithm with double strings using continuous relaxation based on reference solution updating (GADSCRRSU) to solve this multi-objective problem, using goal attainment formulation. The results are also compared against the results of a discrete-time approximation technique to show the efficiency of the proposed genetic algorithm approach.
- 2007-07-01
論文 | ランダム
- 3p-RC-3 TPD型電極部の圧力分布
- 89) 両側冠動脈肺動脈瘻の2例 : 狭心痛様胸痛との関連について : 日本循環器学会第55回近畿地方会
- 特別寄稿 コンクリートの劣化診断と補修法
- 218 適応フィルタを用いたころがり軸受の音響診断(オーガナイズドセッション : O.S.2 音響・振動による診断技術I)
- 最近の箱根火山の地震活動について : 日本火山学会1977年度春季大会