3C2 IMPROVEMENT OF CONVERGENCE OF COLUMN GENERATION FOR RAILWAY CREW SCHEDULING PROBLEM
スポンサーリンク
概要
- 論文の詳細を見る
Railway crew scheduling problem is the problem to determine an optimal assignment of crews to each train to minimize the number of crews satisfying set covering constraints. Column generation is an effective technique for solving the railway crew scheduing problems. The problem is formulated as a huge set covering problem. Column generation requires a lot of replications to derive a lower bound. Moreover, it takes considerable computation time to obtain an upper bound using the conventional method (branch and bound for restricted columns). In this paper, we propose an improvement of column generation for railway crew scheduling problems to reduce computational effort. Dual inequalities for deriving a lower bound and a heuristic to construct a feasible solution are proposed. Computational results show the effectiveness of the proposed method compared with those of the conventional column generation.
- 2009-07-04
著者
-
Nishi Tatsushi
Mathematical Science For Social Systems Graduate School Of Engineering Science Osaka University
-
Muroi Yuki
Mathematical Science for Social Systems Graduate School of Engineering Science, Osaka University
-
Inuguchi Masahiro
Mathematical Science for Social Systems Graduate School of Engineering Science, Osaka University
-
Muroi Yuki
Mathematical Science For Social Systems Graduate School Of Engineering Science Osaka University
-
Inuguchi Masahiro
Mathematical Science For Social Systems Graduate School Of Engineering Science Osaka University
関連論文
- 3C2 IMPROVEMENT OF CONVERGENCE OF COLUMN GENERATION FOR RAILWAY CREW SCHEDULING PROBLEM
- 1B3 SIMULTANEOUS DISPATCHING AND CONFLICT-FREE ROUTING FOR AUTOMATED GUIDED VEHICLES USING PETRI NET DECOMPOSITION APPROACH
- A Heuristic Approach for International Crude Oil Transportation Scheduling Problems
- Petri Net Decomposition Approach for Bi-Objective Routing for AGV Systems Minimizing Total Traveling Time and Equalizing Delivery Time
- 4A1 PETRI NET DECOMPOSITION APPROACH FOR AGV SYSTEMS TO MINIMIZE THE DEVIATION OF DELIVERY TIME AND TOTAL TRANSPORTATION TIME(Technical session 4A: Material handling system)
- 5A4 COLUMN GENERATION FOR THE TRAIN-SET SCHEDULING PROBLEM WITH REGULAR MAINTENANCE CONSTRAINTS(Technical session 5A: OS4: Railway scheduling)