4.建築工事の工程管理に関する研究(8) : 部分工事の予定進度曲線の設計
スポンサーリンク
概要
- 論文の詳細を見る
A scheduled progress curve should be smooth without any unevenness, and the amount of work in the middle of construction period should be more than that in the earlier or later period. The curve showing labours for the construction of 4-story reinforced concrete building with the total area of 4000m^2 is in general as shown in Fig. 2 by the solid line, whereas it is desirable that the curve takes a form as shown by dotted line. If the period of construction could be shortened, for instance, by 5 days in concrete work, by 10 days in carpenter work and by 10 days in plastering work, the curve would be moved towards the desired form shown in Fig. 4. The amount of work will be further improved if the minimum amount of materials required by the labours is added, and the scheduled progress curve will approach the ideal form.
- 社団法人日本建築学会の論文
- 1956-07-30
著者
関連論文
- 157 建築工事の工程管理に関する研究(10) : 進度管理を行つた工事の成績(材料・施工)
- 144 建築工事の工程管理に関する研究(9) : 進度管理の実例(材料・施工)
- 22.建築工事の工程管理に関する研究 : 工程曲線と竣工期日との関係(材料・施工)
- 1051 降雨等による休業日数の算定 : 標準工期に関する研究 2(材料・施工)
- 4.建築工事の工程管理に関する研究(8) : 部分工事の予定進度曲線の設計
- 5.建築工事の工程管理に関する研究(7) : 予定工程曲線追跡の実際
- 135 建築工事の工程管理に関する研究 (6) : 出面表の解析とその応用
- 6.建築工事の工程管理に関する研究(5) : 予定工程曲線追跡の方針
- 151 建築工事の工程管理に関する研究 (4) : (予定工程曲線の設計)
- 19. 建築工事の工程管理に関する研究 (3) : (予定工程曲線の畧算法)
- 133. 建築工事の工程管理に関する研究 (2) : 工程曲線の分析