JIT混流組立ラインの多目標順序計画に関する実験(数理的最適化(2))
スポンサーリンク
概要
- 論文の詳細を見る
The assembly of a large variety of similar products involving little or no switch-over cost is characteristic of a number of industries; particularly, the automobile and electronic industries. For assembly lines. in Just-In-Time(J.I.T) manufacturing systems, the basic goal is that of maintaining level sub-assem blies/parts usage. Another important goal is that of balancing the load along the assembly line. The greedy heuristic developed by Toyota (Goal-chasing method) is a classic in this respect. This paper which deals with practical-sized problems, includes two more goals; that is, levelling at the product level, and load balancing on sub-assembly lines. The relative effects of the goals were experimentally investigated, and some findings are reported. The performance of a priority-based heuristic rule is also presented.
- 社団法人日本オペレーションズ・リサーチ学会の論文
- 1994-10-11
著者
関連論文
- 分社制と事業部制における社会的業績評価指標が財務的業績に及ぼす効果
- 原価企画における目標販売価格の決定方法
- 原価企画におけるサプライヤー関係が原価低減に及ぼす効果に関する実証的研究
- パリ第9大学ブッカン教授と日仏米の管理会計を論ずる : 管理会計の国際比較の一齣(経営フォーラム)
- 製品開発組織における目標原価の設定法と配分の権限に関する研究
- JIT環境における車種投入順序問題のための2段階法
- JIT環境における車種投入順序問題のための2段階法
- JIT混流組立ラインの多目標順序計画に関する実験(数理的最適化(2))
- 新規事業進出に関する意思決定支援会計システム