トンネル掘削にともなう内空変位の予測 : 第三白坂トンネルNATM試験施工
スポンサーリンク
概要
- 論文の詳細を見る
It is one of the most important problem for tunnel construction to estimate the final amount of rock deformation. This paper deals with the estimation of the final amount from the mount of deformation in the earlier stage of measurements at Dai-Sau-Shirasaka Tunnel which is under construction with the New Austrian Tunnelling Method. We have distinctly found that the rock behavior after excavation is constituted with viscous and plastic-elastic deformations in adopting new measurement method described in this paper. Rock deformation U can be expressed by the following equations, U=U_v+U_<EP> U_v=a・t U_<EP>=C(1-e^<-D・L>) where, U_v : viscous deformation U_<EP> : plastic elastic deformation t : elapsed time after blasting L : distance between the observation point and tunnel face a, C, D : constants
- 一般社団法人日本応用地質学会の論文
- 1979-09-30
著者
関連論文
- 座談会「応用地質を語る」 : 20周年記念記事
- ダムサイトにおける岩盤の多様性と岩盤区分の問題点 : 昭和49年度研究発表会講演論文
- 施工と水2. 山岳トンネルと水(2)
- 施工と水2. 山岳トンネルと水(1)
- トンネル掘削にともなう内空変位の予測 : 第三白坂トンネルNATM試験施工