プログラム作成に対し影響の度合いを与える要因の抽出について
スポンサーリンク
概要
- 論文の詳細を見る
A programming time calculation method has been reported, wherein elements which influence programming and debugging time were selected. This paper describes the method of selecting these elements. First answers for the enquete were obtained from 66 programmers (Table 2.1) and a correlation matrix made by product moment method from them (Table 2.2). Then 4 factors were extracted by using the Centroid Method from the correlation matrix(Table 2.3). Next, to faciliate interpretation of the 4 factors, orthogonal rotation was made 6 times and loading factors were obtained (table 2.4). At last, selection of major factors H (electronic computer system).S (objective system), P (programmer) and M (management) was made by interpretation of Table 2.4. Next, 4 clusters of each 4 factors were constructed. From them 4 elements were selected as representative of each 4 clusters. These were considered comparably objectively measurable elements and largely influential elements. That is, the number of input/output files from the H Factor, degree of complexity of program construction from the S Factor. Next, each interaction of 4 elements was examined, and was recognized as negligible (Table 3.1). These Factors were adopted as those influencing programming time.(including debugging time)
- 一般社団法人情報処理学会の論文
- 1972-03-15
著者
関連論文
- 大学病院における作業率向上の一つの研究事例 : 中央臨床検査部におけるワークステーションの設置
- 経営情報システム設計の所要時間算出の問題
- 直線型経営情報システム設計法の実際とその利点
- プログラム作成に対し影響の度合いを与える要因の抽出について
- 遠隔地同時教育に関する研究 : 電子黒板による遠隔地同時教育は可能か(最終回)
- 遠隔地同時教育または2教室以上同時教育に電子黒板を使用する研究(第2報)
- 遠隔地同時教育に関する研究(第一報) : 電子黒板による遠隔地同時教育は可能か(1986年春季研究発表抄録)
- 直線型EDPS化システム設計の背景となる一つの理論
- EDPS化システム設計に関する一つの原理