2315 PBMR の経済性予備的評価 : PBMR と PWR の主要設備における単位出力あたりの建設費比較
スポンサーリンク
概要
- 論文の詳細を見る
The power company of South Africa (ESKOM), is reporting on the construction cost of small modular HTGR (PBMR) indicating its total amount is about 70% of the same output of U.S conventional PWR. We carried out of preliminary economic evaluation, based on the design information of PBMR that is tentatively revealed. We estimated the cost for each facilities of PBMR, in the construction unit price and, facilities constitution proportion that is supposed from recent Japanese PWR. As the result, the construction unit price regarding the civil engineering, mechanical equipment, electricity facilities of PBMR, became about 220,000 (\/kWe) and was about \60,000 (22%) cheaper than the PWR.
- 一般社団法人日本機械学会の論文
- 2000-07-31
著者
関連論文
- B107 光技術を利用した原子炉計装システム
- 2315 PBMR の経済性予備的評価 : PBMR と PWR の主要設備における単位出力あたりの建設費比較
- 2314 高温ガス炉開発の南ア等の国際動向 : 小型モジュール炉による実用化