This paper presents a novel method to evaluate replacement plan for aged thermal power plants under uncertain circumstances through a real option approach. The most economical plan is selected among the three options: an option to operate an existing oil-fired thermal plant, an option to mothball it, and an option to abandon it and to construct an advanced gas combined cycle power plant (ACC) at the same time. Basic ideas of our model are: we use quadranomial approach in order to evaluate an option value consisted by two different uncertain assets; we consider cash flow with a dividend in order to reflect conditions of an aged oil-fired thermal plant and use the sequential compound option approach; we evaluate replacement time using quadranomial decision tree taking into account the options. We also analyze value and time of replacement using numerical examples. Our proposed method will be practically used for generation planning. For example it is possible to make priority quantitatively in replacements of aged thermal power plants by real option values. The target year of replacement may be set as a year when cumulative probability of replacement becomes over certain level.
- 2010-06-01
著者
関連論文
- 3母数ワイブル分布に基づく電力設備の平均寿命推定法
- 修正ハイブリッド法によるJEPXスポット価格のモデル化
- リアルオプション手法を応用した経年火力発電設備更新の経済性評価
- 3パラメータワイブル分布に基づく設備群の平均寿命推定法
- 中国における電力市場化の特徴と今後の展望
- 競争環境下におけるIPP導入シナリオ及び長期電源計画への影響
- CO2排出量最小化のための火力発電機最適組合せの実用計算法
- IPPの参入を考慮した電源ベストミックス問題の効率的解法
- 環境要素等を考慮した風力発電プロジェクトのリアルオプション手法による経済性評価
- 環境対策を考慮した電源設備最適投資に関する基礎的検討 : リアルオプション手法を応用したCCSの経済性評価
- 負荷形状に合わせた供給条件を考慮したポートフォリオ理論による最適電源構成に関する検討
- ハイブリッド価格モデルによるJEPXスポット価格のモデル化
- 環境対策を考慮した電源設備最適投資に関する基礎的検討(2) : CO_2排出制限による電源構成への影響について
- 稼働率を考慮したSVR最適配置手法
- 地域冷暖房システム最適熱源計画における拡張DPアルゴリズムの適用
- リアルオプションによる海外発電プラントの投資価値評価